top of page

Professional Experience

Intersection Improvement Project

​

FDOT is conducting project development and environment (PD&E) studies for the purpose of improving the US 41 at Fruitville Road Intersection. Signal improvement and roundabout have been proposed as the new design. I have conducted the traffic analysis of the proposed designs. I completed the operational analyses, simulated the intersection/roundabout using PTV VISSIM and evaluated the network performance. In addition, I used 3ds Max and V3DM to create graphics,  which we can then use for animation purposes.

Evaluating the Implementation of Managed Lanes 

​

FDOT is evaluating the implementation of Managed Lanes along the SR 690 corridor and the SR 686. The Gateway Expressway component of the Project undertakes major additions and changes to the existing roadway system in order to enhance safety, add capacity and mobility, and meet all project commitments and the Department’s requirements. I am performing CORSIM traffic analysis for the AM and PM peak hour conditions for the build scenario.

Traffic Study for IL 120 from US 45 to Almond Road 
​

ILDOT has initiated a traffic study to reduce emissions of CO and other greenhouse gases through geometric design improvements along IL 120 (Belvidere Road) from US 45 to Almond Road. Geometric design modifications have been proposed to improve the environmental performance of IL 120. I have used TSIS version 6.3 to model the existing condition, modified it to reflect the modifications in the build conditions, performed emission analysis for morning and evening peak hours, and proposed the best solution.

Design Build Project
​

The design-build project is located along Military Highway and US Route 13 in Virginia. The project length is approximately 1.58 miles. The project includes the installation of continuous flow intersection (CFI) elements along Military Highway, near the Norfolk Airport, in a very urban area that is lined with businesses on each side of the roadway. Any changes to the current MOT configuration needs to be analyzed. I review and analyze the effect of new configurations on traffic flow by simulating the current and future conditions in VISSIM and Synchro. 

bottom of page